📝 Description
A real estate object classified as 'Other property' (Bridge No. 15) is being sold at the initial auctions with a starting price of 1936 EUR. This unique non-standard auction item can become an investment or part of an infrastructure project depending on possible applications.
The bridge was manufactured in 2003, with a total length of 12 meters and width of 2 meters.
The condition presents challenges: wooden structures are damaged by rotting, while metal structures show signs of corrosion. This is important information for a potential buyer when evaluating dismantling and transportation costs.
The auction starts on 2024-09-25 09:00:00 and ends on 2024-09-26 13:59:59. Registration for participants takes place from 2024-09-16 00:00:00 to 2024-09-17 23:59:59.
Payment conditions require quick action: the remaining amount after the initial deposit must be transferred to the specified bank account within 2 working days from the auction end. The winner must sign the property handover act within 3 working days from final payment. A special condition is that the auction winner must remove the bridge within 1 month after full payment.
The property can be inspected during working hours (9:00 to 15:00) from 2024-09-10 to 2024-09-12, coordinating the time in advance.
The bridge was manufactured in 2003, with a total length of 12 meters and width of 2 meters.
The condition presents challenges: wooden structures are damaged by rotting, while metal structures show signs of corrosion. This is important information for a potential buyer when evaluating dismantling and transportation costs.
The auction starts on 2024-09-25 09:00:00 and ends on 2024-09-26 13:59:59. Registration for participants takes place from 2024-09-16 00:00:00 to 2024-09-17 23:59:59.
Payment conditions require quick action: the remaining amount after the initial deposit must be transferred to the specified bank account within 2 working days from the auction end. The winner must sign the property handover act within 3 working days from final payment. A special condition is that the auction winner must remove the bridge within 1 month after full payment.
The property can be inspected during working hours (9:00 to 15:00) from 2024-09-10 to 2024-09-12, coordinating the time in advance.
❓ Frequently asked questions
Kokia pradinė Tilto Nr.15 kaina aukcione?
Tilto Nr.15 pradinė kaina aukcione yra 1936 EUR.
Kada baigiasi aukcionas ir kada galima teikti paraiškas?
Aukcionas baigiasi 2024-09-26 13:59:59. Registracija vyksta nuo 2024-09-16 00:00:00 iki 2024-09-17 23:59:59.
Kokie yra privalomi papildomi mokesčiai dalyvaujant aukcione?
Privalomas garantinis mokestis yra 20 EUR, o registracijos mokestis – 10 EUR (negrąžinamas).
Kokia yra Tilto Nr.15 pagrindinė būklė ir matmenys?
Tiltas pagamintas 2003 m., jo ilgis 12 m ir plotis 2 m. Medinės konstrukcijos sutrūnijusios, metalinės konstrukcijos pažeistos korozijos.
Per kiek laiko po apmokėjimo reikia išvežti tiltą?
Aukciono laimėtojas privalo išsivežti tiltą per 1 mėnesį po pilno apmokėjimo.
Kada vyks tilto apžiūra?
Tiltą galima apžiūrėti nuo 2024-09-10 iki 2024-09-12 darbo valandomis, iš anksto suderinus laiką.
Kokie yra mokėjimo terminai laimėtojui?
Likusi suma po garantinio įnašo turi būti pervesta į nurodytą sąskaitą per 2 darbo dienas po aukciono pabaigos.